The underground water purification plant has a burial depth of 9 meters, a length of 205 meters, and a width of 85 meters. The above-ground structures include a laboratory and an office building, which are made of reinforced concrete and steel structures. The total sewage treatment capacity is 80,000 tons per day. The scope of AI optimization includes the foundation pit, pile foundation, water tank, and upper structure.